Maintenance Summary Dashboard

Ringkasan project, checksheet, equipment, dan stok P3K

Periode
30 Oct 2026 Refresh
Total Project
88
Total project terdaftar
Finish
88
100% completion
Open
0
Belum finish
Material Issue
0
Waiting / request
Overdue
0
Lewat finish date
Evidence
85
Total media project
3
Project no media / no evidence
A.
Project Summary
Status Project
88
Total Project
Finish88 (100%)
Open0 (0%)
Overdue0 (0%)
Other0 (0%)
Critical / High Risk Project
Definisi tanpa score: Critical = project belum finish yang Overdue atau Material Issue.
High = project belum finish yang punya kondisi Progress <50%, No evidence, No PIC, No checkpoint, atau No finish date.
Critical / High3
Critical0
High3
Clear85
rubah selving rak lantai 3 2 unit
Finish • Progress 100% • No evidence
HIGHRISK
Pmebuatan Bracket IFP 2 Unit
Finish • Progress 100% • No evidence, No finish date
HIGHRISK
Pembuatan box PE Foam
Finish • Progress 100% • No evidence, No finish date
HIGHRISK
Klik angka/card untuk melihat daftar project dan kondisi aktualnya. Tidak pakai risk score, jadi angka langsung bisa ditelusuri ke data.
B.
Workload & Follow-up
Ringkasan Tindak Lanjut
3
Critical / High Risk
Project
13
Maintenance
Due
2
P3K Issue / Due
3
Project
No Evidence
Prioritaskan item kritikal, maintenance due, dan P3K issue untuk penanganan segera.
C.
Inspection & Equipment Health
Inspection Check Summary
0Approved
0Warning Check
0Critical Check
Equipment Health Summary
7Healthy
0Warning
1Critical
Avg Equipment
Health
87.2%
Avg Inspection Score100
Top Temuan Inspection (Pareto)
Belum ada data pareto WARNING / CRITICAL.
CriticalWarning
D.
P3K Stock Summary
P3K Box Low Items36
Gudang Low2
P3K Box Low Items
lantai 3
Area: Lantai 3
LOW 9
Kotak lantai 2
Area: Lantai 2 • dekat pintu masuk
LOW 8
Ruang UKS
Area: Lantai 1 • Dekat Pintu Masuk
LOW 7
P3K Gudang Low Items
paracetamol
Min stock: 10 pcs
0
plaster
Min stock: 1 roll
0
Ringkasan Operasional
Total Project88
Equipment Avg Health87.2%
Inspection Avg Score100
P3K Box Low Items36
P3K Gudang Low2